AMENDMENT TO S.C.A. CIRC. NO.435615

Reference is made to the reductions of Long Haul Rebates and Circ.No.435615. 
Suez Canal Authority allows for vsl's stoppage in intermediate ports for routine or emergency repairs without changing the percentage of reduction under the following conditions:

1. Maximum period for repairs is six (6) days.
2. The repairs must be supported by a Certificate from the Port Authority or from the Dockyard.